Preliminary and final design for the drainage network

Preliminary and final design for the drainage network hydrologial assessment and engineering design of the drainage network Location: Ponte nelle Alpi, Belluno Province Date: 2022 Client: Ponte nelle Alpi Municipality Project Type:...

PV plant hydraulic assessment

PV plant hydraulic assessment Hydrological and hydraulic assessment to support the design of the PV plant Location: Grosseto, Italy Date: 2022 Client: Regener8 Project Type: Water resources...

Montegrande project final design

Montegrande project final designMontegrande project final design Feasibility study and final design of the irrigation component of the Montegrande project Location: Monte Grande, Domnican Republic Date: 2022 Client: Studio Pietrangeli Project Type: Irrigation...

Assemini PV plant hydraulic assessment

Assemini PV plant hydraulic assessment Hydrological and hydraulic assessment to support the design of the PV plant Location: Assemini (Cagliari Province) Date: 2022 Client: Stantec S.p.A. Project Type: Water resources...

Rio Fontane water intake design

Rio Fontane water intake design Preliminary and Final design of a water intake Location: Pederobba (Treviso Province) Date: 2021 Client: ATS Alto Trevigiano Servizi Project Type:...